Reasons Why
we need
New Space
To Share Our
Faith
(A
$3,200,000 campaign)

1st Timothy 6:18-19
“Tell them to do good, to be rich in good works,
to be generous, ready to share, thus accumulating as treasure a good foundation
for the future, so a to win the life that is true life”
Table of Contents
The following document outlines the capital
campaign for St. Mary of the
|
o
Table of Contents o
List of Campaign Volunteers o
History o
Primary areas addressed in the
capital campaign o
Summary o
Renovation Visual |
2 3 4 6 8 12 14 15 16 |
Many volunteers have been and
are currently involved in the proposed project. Current volunteers at this
writing include:
Steering Committee
Dennis Spano, Co-Chair Don Grundman
Mark Nichols, Co-Chair Ann
Nibbe
Greg Schreck, Co-Chair Bill Webster
Father Russell Rich Bouquet
Louy Stambaugh Pat murphy
Mike Kieffer Pete Webster
Patty Neisius Rich Kaufmann
Bob and Mary Jo Strauss Neal Olson
Bob Kemp Todd Spinner
Dan Coyle Gene Durand
Ruth Schneider Kelly Haeska
Doug Grisim
Case Statement Task Force
Rich Bouquet, Co-Chair Pat Vaplon
Kelly Haeska, Co-Chair Dan Coyle
Tom Kennedy Marianne Kaufmann
Bob and Betty Campion Jerry Berg
Leo Fausch Cheryl Huettl
Judy Burfeind Ann Schreck
Mary Jean Marking John Gruber
Finance
Committee
Mark Nichols Steve Stolz
Ann Nibbe John Gruber
Bill McElmury
Communications Task Force
Ann Nibbe, Chair Kathie Durand
Cheryl Huettl Jody Vaith
Ruth Schneider Jen Swanson
Design Committee
Greg Schreck, Chair Pat Murphy
Ken Willers Rich Bouquet
Ed Bauman Dan Coyle
Rich Kaufmann Doug Grism
* 10/22: those committed to make fundraising
calls
Imagine
a functional and flexible
Facility that will adapt a 19th century church to meet the emerging
needs of 21st century worship and faith life.
- Parishioners will gather
to share and visit before and after Mass in a spacious, open area where
relationships can be fostered.
- The Gathering space
will be available for receptions following liturgies and provide a
welcoming environment to better focus on God and our relationship to Him
and each other.
- During the sacred and
special times of Christmas and Easter, as well as funerals, the spacious
gathering space will be able to accommodate large groups of those wishing
to gather, worship and pray.
- A fully functioning,
safe and efficient kitchen facility will be relocated to better serve the
needs of parish.
- Large, open rooms will
provide welcoming educational opportunities for our youth and adults alike
that will better serve young families when they attend Generations of
Faith.
- Older adults or those
with physical limitations will be able to access any area of the building
with ease due to the new elevator and more accessible construction.
- The Fireside room
offers a comfortable environment where immediate family and extended
family may gather during times of grief prior to and after funerals.
- As our parish grows
due to consolidations as priest retire room will be available for
administrative services to support our growing 600-family parish with a
multitude of needs from birth to the end of life. Parishioners may be
better served throughout all areas of faith life which often include times
where more private rooms are required for counseling and support.
- Our parish will be
able to offer enough space to reach out to the greater community through
ecumenical events, service and support such as senior citizens
programs, Scouting, AA, blood
drives, natural disasters and community worship.
- Restroom facilities,
accessible for everyone, will be available.
These are a few of the benefits which will be offered
in our new Building and Renovation program at St. Mary’s of the
The dream for the new building project for St. Mary of
the
By spring of 2007, although the campaign had
experienced a measure of success, pledges and contributions had not reached the
goal in the time leaders had allotted to complete the campaign. Convinced of the
need for the capital project – as the limitations of access, space and
efficiency were still present – Father Russell, staff and campaign leadership
believed an assessment of the campaign strategy was necessary to identify how
to proceed.
Due to the fundraising shortfall the parish hired a
fundraising consultant to evaluate the campaign and make recommendations on how
to reach the final goal. Favorable as well as challenging conditions were
identified. However, the Assessment Study clearly found many positive
opportunities to move forward. Based on this information, the consultant
initiated a proven fundraising strategy which is being led by approximately 50
parishioners.
A
detailed and interesting account of the growth of the Catholic faith in
We are grateful for the foresight of former St. Mary’s
parishioners who took the initiative to construct our beautiful parish in 1877
and who worked to see that the parish continued to serve the parishioners for
the Lord’s glory.
The history of significant capital campaigns at St.
Mary’s are outlined in the following table:
|
WHAT |
WHEN |
* NUMBER OF FAMILIES |
NUMBER OF $'S AT TIME |
** NUMBER OF EQUIV 2007 $'S |
|
|
|
|
|
|
|
|
1877 |
150 |
$
20,600 |
$
3,509,414 |
|
|
|
|
|
|
|
|
1923 |
Not Applicable donated by the McCahill's |
$
50,000 |
$
1,348,250 |
|
|
|
|
|
|
|
ADD
CHAPEL TO CONVENT AND OTHER MAINT ITEMS |
1956 |
250 |
$
80,000 |
$
591,250 |
|
|
|
|
|
|
|
BUILD GATHERING
SPACE, OFFICES, CLASSROOMS AND OTHER MAINTENANCE ITEMS |
2008 |
600 |
$
3,200,000 |
$
3,200,000 |
|
|
|
|
|
|
|
** |
Equivalent
2007 dollars assume a 4% average rate of inflation |
|||
|
* |
Note that
in 1877 150 families raised more dollars that 600 families are being asked to
raise in 2007. |
|||
Now it is our turn to help improve our facilities, for
worship and fellowship, to serve us and those who follow by providing:
·
Needed gathering
space
·
Expanded
educational areas
·
Adequate and more
functional administrative area
·
Updated and more
comfortable environment.
Our
fore fathers had a great vision in 1877 that has stood the test of time. We have had generous benefactors who have
enhanced the original investment.
However, we need to now fund another building campaign with the efforts
of the entire faith community.
The initial needs to serve parishioners were
identified and have remained consistent during the course of planning and
fundraising. The plan was given a stamp of approval by the Bishop in accordance
with detailed Diocesan Guidelines, which are required for all renovation
projects. For those who are interested the entire set of Diocesan Guidelines
and the minutes from the various needs survey meetings are available on-line at
the campaign website (www.stmaryslakecity.org)
and in the church library.
“Do
not neglect to do good and to share what you have; God is pleased by sacrifices
of that kind.”
Primary
Areas Being Addressed with this Capital Campaign
Ø
A Welcoming Gathering Space (indicated by those who chose to voice their opinion as our number one
need:
·
For
Father to greet parishioners, as they leave mass, without having to deal with
inclement weather.
·
That is
spacious enough to provide for parishioners to greet and meet each other before
and after mass.
·
That encourages
new families to register at St. Mary’s because they feel comfortable and part
of a vibrant faith community.
·
For
overflow worshippers on those few occasions, such as Easter and Christmas
services, when the church is not always able to accommodate all who wish to
attend.
·
For
receiving lines after weddings.
·
To
provide a place for families with young children to participate in worship
without feeling the need to leave because of distractions that come naturally to
young children.
·
Generally
for comfortable flow and ease of movement:
§
Into
church during sacraments of baptism, confirmation, weddings, funerals, etc.
§
Into the
fellowship hall after services, for coffee and rolls, as well as for large
events such as funerals, parish chicken dinner and other community needs.
Ø
More Flexible
Rooms:
·
To
accommodate our educational requirements, such as Generations of Faith, First
Communion and Confirmation classes.
·
To
provide elevator accessible space for all organizations within our faith
community, such as CCW, Knights of Columbus,
·
To
include a comfortable room for small groups to meet for such needs as, funeral
planning, wedding planning, RCIA, Bible Study, Family Counseling, etc.
·
To
provide a room adjacent to and with direct access to the women’s bathroom that
can be used as a bride’s room prior to weddings, or a nursing room for new
mothers.
·
That is
more adaptable to our needs, such as:
§
A
conference room that can be used for meetings of the Parish Council, Finance
Committee, Liturgy Committee as well as vendor visits.
§
A
Fireside room that may be used for committee meetings, counseling, small daily
mass services etc.
§
Classrooms
that may be expanded or contracted with the use of movable partitions to
accommodate our Generations of Faith requirements as well as any future needs
that evolve.
Ø
A Safe
Kitchen:
§
For our
volunteer workers. Our current kitchen:
o
Has
unreliable equipment.
§
Ovens
§
Freezer
§
Dishwasher
§
Coffeepot
o
Has
plumbing and electrical components that do not meet code.
o
Has an
inefficient and inadequate amount of storage.
§
With equipment for which we can find
replacement parts.
Ø
Offices Designed:
·
For the
purpose for which they are used. For
example:
§
Father’s
office does not have a proper level of privacy to assure the required level of
confidentiality. This discourages and
inhibits parishioners from discussing topics of importance.
§
Administrative
work areas have inefficient spaces such as improper counter spaces for
supplies, copiers etc.
§
Administrative
work areas have inadequate control of visitor access thus exposing confidential
materials, such as financial reports or whatever may be on the computer screens
etc.
·
To provide
sufficient space for all staff.
Currently some staff are officed in classrooms.
·
To
provide a secure and welcoming environment to visitors. Currently it is difficult for strangers,
visiting during the week, to find the entrance to our facility. When they do find it then the next challenge
is to find the offices. It is generally
not an inviting environment.
In contrast the new facility uses the same
new main entrance for office visitors as for worship services. The offices are immediately visible upon
entering with a welcoming lobby area. If
desirable the congregating areas (Church, Gathering space and Fellowship hall)
can be secured and/or monitored from the office reception area at the main
entrance.
Ø
A More Functional
and Flexible Fellowship
Hall:
·
Unrestricted
by numerous pillars.
·
With a
welcoming entrance, from the Gathering Area, that will not feel constricted by
a long hallway past the kitchen and offices.
·
With a second
entrance/exit to the gathering space so as not to further bottleneck flow into
the hall with two way traffic during large events.
·
That
will accommodate 40% more seating than the current configuration of our hall.
·
With a new
safe kitchen relocated to the SW corner away from the traffic flow into and out
of the hall.
Ø
General improvements to the operation and safety of our facilities:
·
Will
provide a sprinkler system for fire safety.
·
Will
replace bathrooms which are not up to code with the Americans with Disabilities
Act (ADA) requirements.
·
Will
replace the roof and windows, on our fellowship hall, which lose copious
amounts of heated and cooled air and are costing a great deal of our annual
operating budget.
·
Will
upgrade furnaces and air conditioning equipment which are antiquated and
causing operational inefficiencies.
·
Will
provide generally more on-site parking but, even more importantly, more
handicapped accessible parking closer to the main entrance.
·
Will be
designed for the easy addition of a covered drop-off / pick-up canopy by our
new main entrance.
Fix-up
what we have: Although that could be done, the reality is that we
have some serious issues with the current facility:
·
The roof on our
McCahill building cannot be patched, it rather needs to be entirely removed and
built back as new.
·
Our kitchen is
old and some consider it unsafe.
·
We are unable to
get replacement parts for many of our appliances.
·
Our bathrooms do not
meet code.
·
Many of our
parish organizations are unable to use the second floor due to accessibility
issues.
·
Our heating and
cooling systems are old, inefficient and in need of upgrade.
According
to estimates obtained in 2005, to fix the current problems with our facility
would require $700,000. However, without significant redesign of the facility,
we will still fall short of meeting the needs of our faith community as
outlined in this document. Furthermore,
if we were to just fix what we have and later decide that we need to address
the improvements proposed in our new plan then whatever we would have invested
will have been wasted as it would mostly all have to be destroyed to make the
these significant improvements.
No
one wants that to happen.
Tear
down the McCahill building: It has been suggested that it is too expensive to
renovate the McCahill building. However,
with our proposed design, the McCahill building is really a new structure when
completed. This means it has the roof removed,
a new steel frame placed inside and a new roof put on. The interior steel frame supports an entire
new interior – new electrical, plumbing, kitchen and walls. All of the existing windows will be
replaced. Essentially this is a new
building.
The
estimated cost of these changes to the McCahill building is $120 per square
foot. This is the most inexpensive
square footage of the project and considerably less expensive than the cost of
removing the building and replacing the equivalent square footage in a new
structure.
Operating
costs will become unaffordable: Cost estimates by design engineers comparing our
current operating costs to the projected operating costs of the proposed new facility
actually show little change and possibly a reduction in operating costs. This surprising conclusion is the result of
more efficient heating and cooling equipment along with gains made from today’s
more effective construction methods and more efficient insulation in all
components of the building.
The fundraising consultant outlined the process by
which the parish would gain answers to the many questions that needed to be
addressed before the Second Phase of Fundraising could succeed. Five Task
Forces (please see page 2 of this document for the task forces and members who
are involved) were developed to address vital questions.
It became apparent in the Assessment Study that
parishioners were unclear about the extent of the planning process and the
significant amount necessary for the renovation project. They had questions as to whether the plan was
appropriate and whether a different plan -- perhaps a single story, slab on
grade construction -- could be built less expensively.
In response to contributors’ desires that the plan was
right for the parish and that cost effectiveness was paramount within the scope
of planning, a Design Evaluation Task Force analyzed the construction details
and made suggestions to get the most for our dollar while still providing the
key space and amenities.
During this process, the Task Force interviewed
potential general contractors and combed through the current architectural
plans. After considerable and careful review, the Task Force recommended to
stay with the current plans for renovation as opposed to demolition and new
construction. They believe the plan is generally very good and will provide
sound opportunities for the parish’s future. In addition, since $272,000 has
already been paid to the architect for the nearly completed plans, it would be
wasteful, without overwhelming evidence that the current plan is seriously
deficient, to start over with a new plan which would require additional
architectural costs.
1
Peter 4:10
“As each one has received a gift, use it
to serve one another as good stewards of God’s varied grace”
We at St. Mary’s have serious needs to bring our
facilities into compliance as well as to meet the needs of the 21st
century. The sacrificial investment that
our forefathers made in 1877 has stood the test of time. It is now our turn to again make a
sacrificial investment that will similarily stand the test of time.
A dedicated group of your fellow parishioners have spent
many hours re-examining the needs of our faith community. They have again concluded the most
appropriate solution to those needs is essentially as proposed in September of
2006. Each of us must carefully examine
our capacity to give and then commit to participating at a sacrificial level in
our five year pledging program.
Mother
Teresa
“Do something beautiful for God”
2
Corinthians 9:7
“God loves a cheerful giver”